PCI currently has a three (3) year contract with Northeast Ohio Regional Sewer District (NEORSD) to perform maintenance and repairs at NEORSD’s Renewable Energy Facility located at Southerly Wastewater Treatment Center. The duration of the contract is from October 2015 to October 2018 with a two (2) year renewal option. The scope of work included:
1. Calibration, Routine Maintenance, and Repairs
2. 24/7 Hotline – Emergency response
3. Urgent Repairs
4. Instrument installations, loop checks, and troubleshooting
Northeast Ohio Regional Sewer District – P-1199 Instrumentation Maintenance and Repair Services for the Renewable Energy Facility
Northeast Ohio Regional Sewer District – P-1199 Instrumentation Maintenance and Repair Services for the Renewable Energy Facility
Our work scope involves the troubleshooting, repairs and installation of instruments if required. The instruments consist of flow transmitters, level transmitters, pressure transmitters, differential pressure transmitters, temperature transmitters, temperature switches, flow switches, solenoid valves, valve actuators, chart recorders, gas detection systems and specialty analyze transmitters. All field instruments are integrated into the SCADA System, which we also help maintain. Manufacturers equipment includes the following:
1. Rosemount, ABB, Endress + Hauser, and Unimag flow meters
2. Rosemount, Yokogawa pressure transmitters
3. ISCO flow meters and samplers
4. Analytical transmitters
5. Siemens Milltronics HydroRanger level instruments
6. Allen Bradley PLCs
Construction date: Oktober 2015 | |
Location: Slovenija, Ljubljana | |
Value: $1.299.525,00 | |
Investors website: www.clickhere.com |